US 101 / Blossom Hill Road Interchange Improvements

Working for the City of San Jose, HMH led the Project Initiation Document, Project Approval & Environmental Document, and PS&E Phases of the award-winning US 101/Blossom Hill Road Interchange Improvement project. the project infilled and seismically retrofit the existing Blossom Hill Road Overcrossing from four to seven lanes, installed a completely grade separate Class I bicycle and pedestrian path for roughly 3000’ through the interchange. The existing northbound on-ramp was realigned and lowered 16’ to accommodate a 100’ clear-span truss POC over the on-ramp. This innovation allowed use of a linear, ADA compliant approach without switchbacks. The project also constructed two PUCs across the southbound ramps to eliminate bike/ped conflicts with over 5,000 peak hour vehicles throughout the project. The project closed a key gap to the Coyote Creek Trail and reconnected communities previously divided by the highway.
Overall, HMH services included project management, environmental technical studies, environmental clearance, topographic survey, right of way mapping, civil roadway, and landscape design, plans, specifications and estimates, and construction support.
 
AWARDS WON
  
 
Project Video Courtesy of VTA:

https://hmhca.com/wp-content/uploads/2017/11/101BHR_CTF.mp4
 
View the Truss Erection:
https://hmhca.com/wp-content/uploads/2017/11/US-101-Blossom-Hill-Road-Truss-Erection.mp4