Regnart Creek Trail

The Regnart Creek Trail, envisioned in the City’s 2016 Bicycle Plan, provides a tremendous opportunity for off-street bicycle and pedestrian connections in an urban environment. Positioned along a 12’ access road, the project will re-purpose the existing Valley Water maintenance road with an 8’ decomposed granite trail. The project includes upgraded roadway crossings, a prefabricated bike/ped bridge and relocation of a maintenance ramp extending into Regnart Creek. HMH completed the Feasibility Study and is concurrently performing Environmental Clearance, Detailed Design and Permitting activities. The project, which abuts dozens of private back yards, has been controversial in the community. HMH has carefully balanced the needs of the community, the impacts to nearby residents and the requirements of Valley Water to deliver this complex project.

Services

  • Feasibility Study
  • Environmental Clearance
  • Permitting
  • Topographic Survey
  • Drainage Design
  • Plans, Specs and Estimates

Location

Cupertino, CA

Completion

2018 - 2023

Key Facts

  • Client: City of Cupertino
  • ¾ mile trail through residential Cupertino on existing maintenance road
  • Permitting with RCWCB, CDFW and USACOE
  • Close coordination with Valley Water
  • Extensive and engaging public outreach

Let's Talk About Your Project