New Search

If you are not happy with the results below please do another search

304 search results for:

21

Equinix Great Oaks South/SV12

HMH’s involvement included the acquirement of a Special Use Permit and construction documents for development of a greenfield site to accommodate a campus of three 2-story buildings totaling approximately 465,000 square feet. Preparation of plans for the first building on the campus, the 153,000 square foot SV12 building and improvements within the fronting public streets was nearly complete when the owner revised the project to increase the number of generators. This triggered the requirement for a Small Power Plant Exception approval from the California Energy Commission (CEC), which is currently in process along with an amendment to the City’s previously approved Special Use Permit.

22

Shane Steed

Shane has over 30 years of experience in land surveying, including over 24 years in the field as a Party Chief. He has extensive experience in project management, client relations and support, and quality control services and procedures. Shane currently serves as HMH’s field survey supervisor as well as senior field engineer, and his responsibilities […]
24

Montague Expressway Pedestrian Over Crossing

As part of VTA’s work on the BART expansion to San Jose, the Montague Expressway POC connects the new transit-oriented developments north of Montague Expressway to the new Milpitas BART Station south of the expressway.
Travelers have access to it on one side from in front of the new The Edge apartment building to the second floor of the existing parking garage at the Milpitas Transit Center on the other end. It includes a staircase leading from the ground floor on both sides of Montague Expressway up to the bridge that will cross above Montague. There will also be elevator access at the north end of the bridge, as well as from the western edge of the parking garage at the Milpitas Transit Center.
The team included Biggs Cardosa, DMZ Builders, FMG Architects, Salas O’Brien, Alliance Engineering Consultants, Parikh Consultants, and Artik Art & Architecture.

25

Microsoft Data Center, SJC04

This Microsoft Data Center project involves a new data center campus on approximately 21.25 acres of greenfield site. It will also consist of a one 5-story data center building and the entire associated sitework.
HMH’s involvement includes design of the sitework only, consisting of grading, drainage, stormwater treatment, site “wet” utilities (storm, sanitary, domestic water, fire water and recycled water), site roadways and parking, and landscape. We will also provide design of the grading, paving and storm drainage for a new electrical substation. Furthermore, we’re responsible for coordinating the layout of all site utilities; however, design of “dry” utilities (telecommunications, fiber, gas, electric, gas, etc.), and the substation facilities is not part of the scope of work.

26

918 Rich Avenue

918 Rich Avenue is a residential condominium redevelopment project collaboration between HMH Landscape Studio and the Stoecker and Northway Architects in Mountain View. Spanning approximately .72 acres, the site will include a new 28-unit building consisting of one-and two-bedroom units, surface parking, one level of below grade parking, and four below-market rate units for affordability. As it’s currently pending development, landscaping improvements for the on grade and fifth floor roof deck will include an overhead structure, paving, fencing, raised planters and biotreatment planters, drought tolerant plantings, and irrigation.
 

27

Angelica Valera, CAPM®

Brought in as HMH’s first-ever proposal coordinator to focus on bid, RFP, RFQ, and RFI efforts, Angelica Valera hails from an editorial design and journalism background. Her passion for editorial design stems from her love for the look and feel of magazines and books. Seeing and feeling the tangible product excites her, as she’s able […]
28

Janet Mo, MBA

Janet Mo provides a unique perspective in marketing, finance, and business. She’s gone from working at Santa Clara University as a marketing intern, to financial services, then retail and now, the A/E/C industry. She manages our department budget, assists in business development efforts, guides social media posts to help grow our marketing channels, provides support […]
29

Thank You!

Thank You! Thank you for contacting HMH! We will be in touch with you shortly. Contact HMH We welcome your comments and requests for information.
30

San Mateo Wastewater Treatment Plant

The project includes construction of new wastewater treatment facilities required for the City of San Mateo to meet current and future regulations. The new facilities will be built on City-owned land adjacent to the existing wastewater treatment plant facilities. The project also includes a new administration building for plant staff, a new warehouse, an improved pedestrian path and more. Construction for the new facilities are planned to continue until 2024.
HMH collaborated with Sundt Construction, Inc., Malcolm Drilling Company, Inc., Myers and Sons Construction, Inc., Foundation Constructors, Inc., and Kiewit Infrastructure West Co. on this wastewater project. Our Survey team provided various staking services including: shoring staking, pile staking, yard pipe staking, storm drain staking, sanitary sewer staking, water staking, gridline staking, and interior building staking. In addition, we also provided shoring monitoring, perimeter settlement monitoring, and pile as-builts.